Eaton Square, SW1

Home > Portfolio > Eaton Square, SW1

Project brief

Internal removal of existing timber floor and the installation of a new steel frame and ribdeck/RC concrete floor

Demolition and strip out of floors and some internal walls • Large steel beam and column installation • Permanent steel decking and RC concrete slab • Formation of structural opening internally and externally • Temporary works

Excavation & formation of a basement throughout footprint over 3 different levels including pool complex at 6m below ground level works included

Two/three stage Underpinning • Extensive temporary works • Mass excavation of spoil to 6m below ground level • Below slab Drainage • Cavity drain membrane Waterproofing • Insulation and screed

Space created

Basement shell and superstructure

Duration

23 weeks

Size

3100sq ft