Project brief

The excavation of a basement where the ground floor concrete floor was retained and supported by a complete steel structure. The localised ground conditions were sand and gravels on a clay layer and localised dewatering was installed progressing throughout the construction phase.

Duration

28 weeks

Size

800sq ft