Pond Place
Project brief
Soft strip and demolition of rear extension with temporary works to the upper and lower walls. Internal superstructure including steel structure and renewal of timber floors. Basement extension involving the excavation of a single depth basement to 3.4 metres. External works including pointing, roof structure, window and door joinery and roof coverings.
Duration
35 weeks
Size
450sq ft